India GCC guide · Updated November 2026

GCC in India: the 2026 guide for foreign companies.

What a Global Capability Centre is, why mid-sized companies are setting them up, how to own one legally, and what it really takes. Written by the Miracle team for CEOs, CFOs and CTOs.

SummaryA Global Capability Centre (GCC) is an offshore unit a company owns and runs for its own work, instead of buying the work from a vendor. India hosts more than 2,100 of them. In 2026, most new centres are set up by mid-sized companies, often with 10 to 250 people, working on engineering, data, AI and operations. A foreign company can usually own 100 percent of an Indian subsidiary, start within 6 to 10 weeks, and pay $2,650 to $3,600 per person per month all in for engineering teams.

What is a GCC?

A Global Capability Centre, sometimes called a captive centre or global in-house centre, is a team in another country that works only for its parent company. The people are employees of the company, or of its local subsidiary. The work, the IP and the knowledge belong to the company.

That is the difference from outsourcing. With outsourcing, a vendor employs the people and sells you their output. With a GCC, you build the capability yourself, and you keep it.

Why companies build in India

  • Talent at depth. India has one of the world's largest pools of engineers, data specialists and finance professionals, many trained in global companies.
  • Ownership. Companies want to keep IP, data and know-how in-house. Vendors typically add a 30 to 50 percent markup on talent and keep the knowledge.
  • Economics. Fully loaded costs for engineering teams are a fraction of US, UK or German equivalents.
  • A mature ecosystem. Two decades of GCCs mean experienced managers, proven practices and infrastructure built for them.
"Enterprises are no longer starting with scale. They are starting with a strategy." Monica Pirgal, Bhartiya Converge, in Business Today

Who is setting them up in 2026

India had 2,117 GCCs in FY26, generating about $98 billion in revenue and employing 2.36 million people, according to the NASSCOM–Zinnov GCC Landscape 2026. The big shift is who is building them:

  • Mid-market companies. Zinnov counts 583 mid-market GCCs. ANSR says around 60 percent of last year's new demand came from mid-sized firms.
  • Private equity portfolios. About 65 percent of the 220+ mid-market companies that opened Indian GCCs since 2021 were PE-backed (ANSR via Economic Times).
  • Europe. More than 45 percent of new GCCs in 2024 came from Europe, about 28 percent of those from Germany (NASSCOM, via Business Today).

Nano, Micro and larger centres

The market uses these words loosely. Some reports call centres of 100 to 500 people "nano". We use clear bands so buyers know what they are getting:

ModelPeopleTypical shape
Launch Team3–10One team, on a partner's entity
Nano GCC10–50One or two teams, own subsidiary, shared leadership
Micro GCC50–250Several teams and functions, own India leader
Enterprise GCC250+Multi-city campus, full local leadership

How a foreign company owns a centre legally

In most technology and services sectors, India allows 100 percent foreign ownership under the automatic route, so no prior government approval is needed. The usual structure is a private limited company owned by the parent. Setting one up includes incorporation, tax registrations (PAN, TAN, GST), a bank account, foreign investment reporting under FEMA and employer registrations.

There are three common routes:

  1. Employer of Record first. Your team is employed through a partner's entity while your own company is registered, then moves across. Fastest start.
  2. Own subsidiary from day one. Slower start, simplest long-term structure. Often required in regulated sectors.
  3. Build-Operate-Transfer. A partner builds and runs the centre, then transfers it on agreed terms.

Because the subsidiary serves its parent, transfer pricing rules apply. The Indian entity is usually paid cost plus a markup. Plan this with your tax advisers from the start.

The US policy question

US companies often ask whether political pressure on offshoring affects GCCs. Here is the honest picture as of November 2026:

  • The $100,000 H-1B fee introduced in September 2025 makes it harder to bring talent to the US. Many analysts expect it to push more work to Indian GCCs (Outlook Business).
  • The HIRE Act, which proposes a 25 percent excise tax on certain payments for services performed abroad, is a proposed bill, not law. Analysts disagree on whether captive centres would be affected (Grant Thornton).
  • A US company owning an Indian subsidiary is legal and common. A GCC is not a way around US tax, employment or trade rules, and should never be planned as one.

We review the current position with every US client in the India Blueprint.

What it costs

For engineering-heavy teams, expect $2,650 to $3,600 per person per month all in, depending on seniority and city. That covers salaries, benefits, workspace, IT and a management fee. One-time setup for a small centre is usually $15k to $40k. See open-book pricing or model your own team in the Digital Twin.

How long it takes

  • Company registration and registrations: about 4 to 8 weeks.
  • First people working: 6 to 10 weeks, faster if you start on an Employer of Record.
  • Notice periods: most experienced hires serve 30 to 90 days. This is the main driver of timelines.
  • Hiring pace once running: about 10 to 14 people a month per centre.

Where to build

Bengaluru, Hyderabad, Pune, Chennai and Delhi NCR have the deepest talent pools. Tier-2 cities such as the Chandigarh Tricity, Jaipur, Kochi, Ahmedabad, Coimbatore and Indore offer lower costs and less competition for people, and several states now run GCC incentive policies. Compare them on Where to build.

Six mistakes first-time GCC builders make

  1. Choosing the city before the model. Decide the work, size and model first. The right city follows from the roles you need.
  2. Hiring before IP is in place. IP assignment must be signed before anyone starts work. It is the difference between owning what the team builds and arguing about it later.
  3. Launching without governance. Agree the reporting rhythm, escalation path and decision rights before the first sprint, not after the first problem.
  4. Treating the centre as a support desk. Centres given real ownership of a product area or function perform better and keep people longer than those handed leftover tickets.
  5. Leaving transfer pricing until later. Indian tax authorities look closely at intercompany arrangements. Set the cost-plus model with your tax advisers at the start.
  6. Relying on one recruitment channel. Use several sourcing routes per function, and plan around notice periods.

Risks and how to manage them

RiskHow to manage it
AttritionHire for fit, pay fairly, build career paths, choose cities with less competition, replace early leavers fast.
Leadership gapsShared India leadership while small, then hire your own site lead from about 50 people.
Compliance slipsA live compliance calendar with owners and proof of filing.
Two culturesSame tools, same rituals, regular visits both ways, clear ownership of work.
Vendor lock-inTransfer terms agreed upfront and an Ownership Readiness score.

Frequently asked questions

Can a small company set up a GCC in India?
Yes. Teams of 3 to 10 can start on an Employer of Record, and owned centres of 10 to 50 people are now common among mid-sized firms.
Do we need someone in India to set up a subsidiary?
An Indian private limited company needs at least two directors, one of whom must be resident in India. A partner can help you meet this requirement properly during setup.
Is a GCC in India the same as outsourcing?
No. A GCC is owned by the parent company and works only for it. Outsourcing buys services from a vendor that owns the people.

This guide is general information, not legal or tax advice. Rules change; we review the current position for every client.

Next step

Start with a 30-minute call.

Tell us what you want to build in India. We will tell you, honestly, whether a GCC is the right move and which route fits.

See your India centre before you build it.Build your Digital Twin